Nuclear Regulatory Commission/Flickr October 22, 2020 Earthquakes and the H.B. Robinson Plant: A Case Study of the NRC’s Failure to Learn from the Fukushima Accident Ed Lyman Director, Nuclear Power Safety
September 6, 2018 Vogtle and Hatch: Have Cost Over-Runs Undermined Safety Performance? Dave Lochbaum Former Contributor
August 13, 2018 Obstruction of Injustice: Making Mountains out of Molehills at the Cooper Nuclear Plant Dave Lochbaum Former Contributor
August 9, 2018 Pipe Rupture at Surry Nuclear Plant Kills Four Workers Dave Lochbaum Former Contributor
August 8, 2018 Obstruction of Injustice: Columbia Generating Station Whitewash Dave Lochbaum Former Contributor
July 2, 2018 NRC’s Reprisal Study Reveals Safety Agency Has a Chilled Work Environment Dave Lochbaum Former Contributor
June 20, 2018 Role of Regulation in Nuclear Plant Safety: A New Series of Posts Dave Lochbaum Former Contributor
May 17, 2018 High Energy Arc Faults and the Nuclear Plant Fire Protection IOU Dave Lochbaum Former Contributor
Rama/Wikipedia May 7, 2018 NRC Cherry-Picking in the Post-Fukushima Era: A Case Study Guest Commentary
April 24, 2018 The “Race” to Resolve the Boiling Water Reactor Safety Limit Problem Dave Lochbaum Former Contributor
March 26, 2018 Fukushima’s Nuclear Safety Dividend at Surry Nuclear Plant Dave Lochbaum Former Contributor